Duration: September 2015 to November 2015. Brieft: Supply of a new 4 bay modular nursery block to remove existing nursery building which continue reading
Supply and install 2 number 10 bays modular buildings for use as toilet block, track shop & site office continue reading
The client was extremly pleased with the unit especially the external finish of the cladding and steni as it matches the main school buildings and also continue reading
To remove the old pavilion (which was second hand 30 years ago) and replace with a new pavilion. The old building was in a poor state of repair and was replaced continue reading
The initial brief was for the supply of a 3 bay modular classroom block with timber cladding finish internally and externally continue reading
MRC had to work closely with the arena to design and install a new hospitality building to continue reading